New lifting windows for the Grindelwald Terminal station

INTECH-ICS AG was able to deliver six new lifting windows for ticket sales for Grindelwald Infrastruktur AG. Customers and staff can optimally correspond with each other through these lifting windows. INTECH-ICS AG thanks everyone involved for this valuable order. Excerpt from the Jungfrau Railways media release ( whole message here ) at the opening:
Together with the Grindelwald-Männlichen gondola lift (GGM), the Jungfrau Railways are realizing the V-Bahn generation project to secure the long-term future of tourism in the entire Jungfrau Region. After 18 months of construction, the GGM can start operations on time. The new building has enormous advantages, especially for winter sports enthusiasts: With 111 gondolas, the transport capacity doubles from 900 to 1800 guests per hour. Time-consuming queues are a thing of the past. The ride in the modern 10-seater gondolas up to the mountain station at 2225 meters above sea level will now only take 19 minutes instead of the previous 30 minutes.

Leave a comment

Please note that comments must be approved before posting